Run a wedge on one cell
Billet heating and press fill, die life or ultrasonic and MPI defect detection, with a metric you already measure.
Forgiron starts with a paid pilot on one heating, press, die or inspection cell and a baseline agreed in writing. Tell us the cell, the metric and the systems on it. We will say plainly whether the wedge fits and what the first ninety days would look like.
Billet heating and press fill, die life or ultrasonic and MPI defect detection, with a metric you already measure.
Heating, press, die and inspection OEMs, MES and simulation vendors, integrators.
We answer plainly, including what is planned rather than done.
Edge perception, OT integration, simulation, forging process engineering.
On billet heating, the stroke, dies, inspection and autonomy in the forge.
Pre-revenue, pre-institutional. We do not claim traction we do not have.
The first-release plan, applied to your cell. Pilots run 90 to 180 days.
Every Forgiron run is an ordered, inspectable sequence. This is run_7c2e41 on Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod. Scenario completes in 10 steps with one approval gate. Surface temperature held at 1,205 °C with a 14 °C core-to-surface spread, fill predicted and confirmed complete, one lap precursor at the flash land cleared by a blow-energy trim, lot L-80412 released with full genealogy.
Plant Orchestrator · Pulled the part spec for the 42CrMo4 connecting rod from MES: forging window 1,180 to 1,230 °C, two-blow closed-die schedule, flash land 2.4 mm, temper to 28 to 32 HRC, 1,200 pieces. Locked the qualified process envelope.
Forge Twin · Simulated 24 candidate heat-and-stroke recipes on the as-forged twin for soak time, blow energy and spray timing, ranked on predicted fill, lap risk at the flash land, die load and kWh per piece.
Heat-and-Billet · Induction power on IH-2 stepped down 4% in the final soak stage as the pyrometer read 1,205 °C at the surface. Core-to-surface spread estimated at 14 °C against a 20 °C limit, no overheat, scale growth inside the window.
Die-and-Lube · Lower-die spray dose raised 6% and cooling extended 0.3 s as die surface temperature climbed through 240 °C. Heat-check growth on cavity 2 flagged at 0.31 of the die-change threshold.
Plant Orchestrator · Recipe #9 moves second-blow energy 3% below the standing schedule. Press-schedule changes stay supervised on this part family, so the step was held for the shift forging engineer and approved at 05:47:31.
Forge-and-Press · Two-blow schedule executed with the approved energy. High-speed vision and force curves confirmed complete fill on the first ten pieces; predicted lap risk at the flash land fell from 0.27 to 0.08.
Defect-and-Inspect · Eight cameras, two thermal cameras and the ultrasonic station fused at the edge. One lap precursor at the flash land on piece 212 flagged and cleared by a 1.5% blow-energy trim inside the approved envelope; the piece was routed to MPI and passed.
Robot-and-Handling · Press-to-trim transfer planned and executed by the handling robot at 11 s per piece, temperature loss in transfer 38 °C against a 60 °C limit, interlock zones clear throughout.
Trim-and-Heat · Temper furnace HT-1 zone 2 trimmed 5 °C against the predicted hardness from the recorded heat and stroke history. First hardness checks read 30 HRC, inside 28 to 32.
Quality-and-Conformance · Lot L-80412 released: genealogy written (billet lot, heat curve, stroke record, die cycles, inspection map, approvals, temper record) and dispositioned against IATF 16949 criteria with cited evidence for the quality engineer's sign-off.
Land on one workflow with a measured baseline. Expand by cell, module and autonomy level. Outcome components are available on yield, scrap, die life and energy. Annual prepay carries a 15 to 20% discount.
Heating or forging control, die management, or inspection AI for one cell. For forges validating ROI on the wedge.
The whole forge: heat and billet, forge and press, die and lube, trim and heat-treat, defect, quality and property, yield and takt, robotic handling and the twin.
Multi-site forging groups standardising on Forgiron, with custom alloy, die and qualification models.
Forgiron writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, and every action is written to an append-only audit log the forge owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| AS9100 and NADCAP assurance packages | Disposition and genealogy evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| Standards-cited reasoning | AS9100, IATF 16949, NADCAP, ASTM documents | RUNNING In the design, every answer cites its source |
| Per-tenant and die-IP isolation | Recipes, die designs, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Sensitive producers | RUNNING Design option |
Forgiron reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in forges, not certified integrations; connector availability is confirmed per site.
Induction and furnace PLCs (EFD Induction, Ajax TOCCO, Inductotherm, SMS group class systems)
Power, zone and soak reads, guarded writes
Press, hammer and ring-mill controls (SMS group, Schuler, Ajax, Sumitomo and Nedschroef, Danieli class systems)
Force, ram and energy reads; supervised schedule writes
Spray, lubrication and die-cooling systems
Dose, pattern, timing and cooling
Thermal cameras, pyrometers, high-speed cameras at the press
Billet and die temperature, fill, surface defects
Ultrasonic and MPI stations and dimensional systems (Waygate, Evident, Magnaflux class systems)
Scans, indications and dimensions per part
Forging FEM packages (Transvalor Forge, Simufact Forming, QForm, DEFORM class tools)
Model and result exchange with the twin
Robots, manipulators and safety PLCs
Pose, grip and path state inside interlocked limits
Austenitize, quench and temper furnaces
Zone, quench and temper reads, guarded writes
The questions plant directors, forging engineers and quality engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified process envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Forgiron writes nothing. Press-schedule changes stay supervised by a named forging engineer until the part family is qualified.
Control returns to the furnace, press or die controller's last known-good state. Forgiron is a supervisory layer on top of the PLCs and interlocks you already run, never a replacement for them, so an outage degrades the cell to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the part spec in the first weeks. Defect, die-wear and heating prediction improve as cell history and labelled outcomes accumulate per part family. The first training sets are sized at 2 million labelled frames and signals, 20,000 heat and press cycles and 10,000 die-life events per design-partner cohort, all design targets.
Only if you choose cloud training. Die designs, part drawings, recipes, process models and quality records are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers, and federated learning across sites is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot of 90 to 180 days on one cell, scoped to a single wedge with a success metric written into the order form: defect-detection accuracy, scrap reduction, die-change reduction, energy reduction or first-pass-quality improvement. The first 30 to 60 days baseline scrap, die life, energy, inspection escapes and takt in shadow mode.
Scrap per lot, unplanned die changes, energy per heat, inspection escapes. We will tell you which wedge fits.
↑↓ navigate↵ openesc close